Automation Production Lines

Service creates value, existence creates the future

Location:Home>Products>Automation Production Lines

Power module automated assembly and testing production line

Listing date:2020-02-21
Views:12168
Type:
Color:
Price:$
Product Details

电源组装产线.png


Application: Huawei power supply multi-layer PCBA modules form a product that requires alignment, detection, and locking. It is one of the step automation equipment for the entire line;


It is an automatic production line for communication equipment power supplies for a major electronics assembly factory, and a fully automatic production line for power supply modules for the communication giant Huawei. The full line includes double-sided SMT, dispensing, depaneling, FCT, assembly, testing, packaging, etc. Walt'ron'te'ch is responsible for dispensing, automatic pin insertion, automatic assembly, screw locking and other work stations, forming a fully automated production line in series with online workstations.


Telecommunication Power Module Assembly and Test Automation

It is an automatic power supply production line for electronic assembly of communication equipment in a large factory, and a full-automatic power module production line for communication giant Hua * *. The whole line includes double-sided SMT, dispensing, splitting, FCT, assembly, testing, packaging, etc. Walt'ron'te'ch is responsible for dispensing, automatic pin insertion, automatic assembly, locking screw and other stations, and is a full-automatic production line in series of online workstations


 Each automated workstation includes high-precision conveyor belt, high-speed precision motion servo, visual inspection, visual alignment, transmission line, Feeder, computer software, automatic inspection and automatic assembly


This equipment is part of Huawei's automatic power supply assembly line. It needs to be fully automated, stable, and has an extremely low error rate. It requires visual correction, inspection, and tooling design for each process to eliminate the possibility of problems.


First work station:

1) Take out the power supply base plate from the Tray that is tested at the upper station, flip it over, visually align it, and put it into the jig

2) Take out the heat sink from the Tray Feeder, visually align it, and put it into the jig


Second work station

1) Fixture positioning and screw hole correction

2) Automatically lock screws and visually correct the picked screws


3rd station

1) Visual inspection of product appearance

2) Automatically sort, flip, put into Tray arrangement, and flow into the next process



Previous:Automobile water spray body automatic assembly test

Next:8-channel Bluetooth thermometer TC8

Hotline

24-hour phone consultation

Mr. Yu:13922277850

Hotline

Scan WeChat

WeChat
Back to top